THE BP SCAM----------SHORT BP SHARES UNTILL RELIEF WELL SUCCESS.
May 29, 2010
– Comments (15) |
RELATED TICKERS: BP
, OIL
, RIG
date: 29 May 2010
BP started the "top kill" operations to stop the flow of oil from the MC252 well in the Gulf of Mexico at 1300 CDT on May 26, 2010.
The procedure was intended to stem the flow of oil and gas and ultimately kill the well by injecting heavy drilling fluids through the blow-out preventer on the seabed, down into the well.
Despite successfully pumping a total of over 30,000 barrels of heavy mud, in three attempts at rates of up to 80 barrels a minute, and deploying a wide range of different bridging materials, the operation did not overcome the flow from the well.
The Government, together with BP, have therefore decided to move to the next step in the subsea operations, the deployment of the Lower Marine Riser Package (LMRP) Cap Containment System.
The operational plan first involves cutting and then removing the damaged riser from the top of the failed Blow-Out Preventer (BOP) to leave a cleanly-cut pipe at the top of the BOP’s LMRP. The cap is designed to be connected to a riser from the Discoverer Enterprise drillship and placed over the LMRP with the intention of capturing most of the oil and gas flowing from the well. The LMRP cap is already on site and it is currently anticipated that it will be connected in about four days.
This operation has not been previously carried out in 5,000 feet of water and the successful deployment of the containment system cannot be assured.
Drilling of the first relief well continues and is currently at 12,090 feet. Drilling of the second relief well is temporarily suspended and is expected to recommence shortly from 8,576 feet.
NONE OF THIS WILL WORK .
IT IS JUST A SHOW OF PUBLICITY DRAGGING TIME ALONG BECAUSE,
ANY PROFESSIONAL ENGINEER IN THE DRILLING INDUSTRY KNOWS THAT THE ONLY ANSWER FOR THIS MESS IS THE RELIEF WELLS.
KEEP IN MIND, BP KNOWS GENERAL AREA'S WHERE DRILLING RELIEF WELLS MAY WORK,
BUT IS NOT SURE WITH ANY DEGREE OF CERTANTY, THAT THEY ARE DRILLING THE RELIEF WELLS IN THE CORRECT LOCATION TO STRIKE THE SAME VEIN AS THE GUSHING WELL.
THE RELIEF WELLS WILL EITHER OF THE FOUR BELOW:
1.) STRIKE THE CORRECT VEIN TO REDUCE AMOUNT OF FLOW AT THE GUSHING WELL.
2.) STRIKE THE WRONG VEIN WHICH WILL NOT REDUCE FLOW OF THE GUSHING WELL.
3.) NOT STRIKE ANY VEIN AT ALL.
4.) STRIKE METHANE..
SUGGESTION:SHORT BP SHARES NOW.